Isuzu — Service Procedure
A Isuzu service procedure — check it applies to your exact model before use.
Browse Isuzu generators & specs →
Procedure
- 1. Always use an engine stand when taking the
- engine down from the vehicle.
- Do not place the engine directly onto the ground,
- or place in a manner that interferes with the oil
- pan.
- 2. If you are working together with others, always pay
- attention to each other's safety.
- 3. If you are repairing any part of the electrical sys-
- tem, always remove the minus side cable from the
- battery terminal before starting work. If you are
- removing the battery cover, always remove the
- cover in a place that is away from sources of fire/
- heat.
- 4. Do not perform painting work or leave the engine
- running for long periods of time in an enclosed or
- badly ventilated indoor workshop.
- 5. Always use the correct specialized tool indicated in
- the instructions. Using the incorrect tool may
- cause damage to the parts or injury to the person
- using the tool.
- 6. All regular tools, gauges and special tools should
- be regularly inspected, and prepared before start-
- ing work. Do not use bent spanners, hammers with
- damaged edges, chipped chisels, or any other
- faulty or damaged tools.
- WSHK0190
- General Information 0A-3
- 7. Always pay close attention to safety and handling
- requirements when using grinders, cranes, weld-
- ers, and other such equipment.
- Moreover, always wear the correct protective gar-
- ments and use the necessary safety tools for the
- job in hand.
- 8. Always check that there are no fuel leaks when
- performing maintenance work on the fuel system.
- (It may cause a fire.)
- 9. Pay close attention to the risk of ignition if you are
- handling parts that carry a high voltage.
- Furthermore, any oil or grease spilt onto rubber
- parts must be wiped off immediately, as it will
- cause deterioration of the rubber.
- Replacement parts and part numbers
- 1. Always replace packing, oil seals, O-rings, caulk-
- ing lock nuts, folding lock plates, split pins and
- other such parts with brand new parts.
- 2. The parts numbers contained in this manual may
- not represent the supply condition of the parts, and
- the part numbers may be changed due to revi-
- sions. Therefore, parts should always be checked
- against a parts catalogue before use.
- WSHK0191
- WSHK0192
- 0A-4 General Information
- Liquid gasket
- 1. Each time you disassemble parts that use liquid
- gasket, completely remove the old gasket residue
- from each of the parts and matching sections using
- a scraper, then clean each of the parts to com-
- pletely remove oil, water, and dirt etc. from the var-
- ious surfaces by a cloth. Using the specified type
- of liquid gasket, apply new liquid gasket to each of
- the surfaces before reassembling the parts.
- 2. In order to make it easier to clean liquid gasket sur-
- faces, apply gasket remover liquid (Pando- 391D
- made by ThreeBond Co., Ltd.) and leave the part
- to stand for approximately 10 minutes, after which
- the old liquid gasket residue will be easier to
- remove.
- However, this should not be used on resin compo-
- nents or painted components.
- 3. Please take care not to apply too much or too little
- liquid gasket.
- Also, you should always re-apply the liquid gasket
- upon itself when you start and finish application.
- 4. Make sure that there are no gaps when reinstalling
- the liquid gasket parts to each other. If there are
- gaps between the two parts, re-apply the liquid
- gasket. Some parts, especially the oil pan, use the
- same size studs as a guide to eliminate the need
- for knock pin positioning etc.
- 5. Re-install these parts within 5 minutes of applying
- the liquid gasket.
- If more than 5 minutes passes, remove the previ-
- ous liquid gasket and re-apply it.
- 6. Please wait for at least 30 minutes since the last
- part is installed before starting the engine.
- Liquid gasket
- • Always use the liquid gasket products listed above, or a liquid gasket identical to the ones listed above.
- • Use the correct quantity of liquid gasket. Always follow the handling instructions for each product.
- Applied area
- Use conditions
- Liquid gasket
- name
- Parts
- Matching parts
- Seal object
- Application
- groove
- 1
- Rocker bracket
- Cylinder head
- Engine oil (10W
- — 30)
- Equipped
- TB 1207B
- 2
- Air inlet pipe
- Cylinder head cover
- Air
- Equipped
- TB 1207C
- 3
- Timing case
- Cylinder block
- Engine oil (10W
- — 30)
- Equipped
- TB 1207B
- 4
- Housing cover; injection pump
- Cylinder block
- Engine oil (10W
- — 30)
- None
- TB 1207C
- 5
- Solenoid; fuel cut
- Cylinder block
- Engine oil (10W
- — 30)
- Equipped
- TB 1207C
- 6
- Retainer; oil seal
- Cylinder block
- Engine oil (10W
- — 30)
- Equipped
- TB 1207B
- 7
- Housing ASM; PCV
- Cylinder head cover
- Blow-by gas
- None
- TB 1207C
- 8
- Indicator; air cleaner
- Air cleaner
- Air
- None
- (Seal tape)
- General Information 0A-5
- Application procedure
- 1. Wipe the contact surfaces clean of all water, oil or
- grease. The contact surfaces should be dry.
- 2. Apply a regular bead width of liquid gasket to one
- of the contact surfaces. Make sure that the bead
- does not break at this point.
- Note:
- If there are special regulations concerning the applica-
- tion procedure in the repair document, please follow
- those regulations.
- Work procedure
- 1. Wipe the joint surfaces of the bolt, bolt hole, and
- threads clean of water, grease, and oil. The con-
- tact surfaces should be dry.
- 2. Apply Loctite to the top 1/3 of the screw.
- 3. Tighten the bolt to the specified torque.
- Important:
- After tightening the bolt, do not apply excessive
- torque or try to rotate the bolt until at least one
- hour has passed, and the Loctite has hardened.
- Procedure for using the plastigauge
- Example: Procedure for measuring the clearance
- between the connecting rod bearing and crank pin.
- • Clean the connecting rod and bearing, and install
- the bearing to the rod.
- • Cut the plastigauge to the same width as the crank
- pin, and while avoiding the oil hole of the crank pin
- lay the gauge parallel to the pin.
- • Line up the marks on the connecting rod and cap,
- and install the crank pin. Apply molybdenum disul-
- fide to the thread section and seating surface of
- the tightening bolt, and rotate both cap and bolt to
- the correct torque.
- Important:
- Do not move the connecting rod while using the
- plastigauge.
- • Gently remove the cap and connecting rod, and
- measure the crushed width of the plastigauge
- (clearance between rod and pin) using the scale
- printed on the bag.
- Type
- Measurable range mm {in}
- PG-1 (Green)
- 0.025 — 0.076 {0.001 — 0.003}
- PR-1 (Red)
- 0.051 — 0.152 {0.002 — 0.006}
- PB-1 (Blue)
- 0.102 — 0.229 {0.004 — 0.009}
- 0A-6 General Information
- Exam
Source: manual:SM-JCB-Isuzu-Engine-AU-4LE2-BV-4LE2-2.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.