Isuzu — Measuring Crankshaft Bearing Clearance with Plastigauge
A Isuzu service procedure — check it applies to your exact model before use.
Browse Isuzu generators & specs →
Procedure
- Clean the clamp face of the cylinder block and crankcase bearing, and also the bearing itself.
- Install the cylinder block to the crankcase.
- Gently rest the crankshaft on the cylinder block, and rotate it approximately 30 degrees to stabilize it.
- Cut the plastigauge to the same size as the journal width.
- While avoiding the oil hole of the journal, lay the gauge parallel to the journal.
- Gently rest the crankcase on the cylinder block.
- Apply molybdenum disulfide to the thread section and seating surface of the tightening components.
Tools required
- Plastigauge
Source: manual:SM-JCB-Isuzu-Engine-AU-4LE2-BV-4LE2-2.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.