Ingersoll Rand — Assembly of the Throttle Mechanisms
A Ingersoll Rand service procedure — check it applies to your exact model before use.
Browse Ingersoll Rand generators & specs →
Procedure
- Coat the Trigger Plunger (11) with oil and insert it into the hole in the Handle (1).
- Install a new Throttle Valve Seat (12) in the Throttle Valve (13) and insert it into Handle, large end first.
- Install the Throttle Valve Spring (14), small end first, then Screen (15). Replace Inlet O-ring (17). Coat new O-ring with O-ring lubricant and install it in the Inlet.
- Screw Inlet into Handle until snug and then tighten to 30-35 ft. lb. (41-47 Nm) torque.
Tools required
- Torque wrench
Specs & torque values
- Trigger Plunger (11)
- Throttle Valve Seat (12)
- Throttle Valve (13)
- Throttle Valve Spring (14)
- Screen (15)
- Inlet O-ring (17)
- Air Inlet Bushing
- 30-35 ft. lb. (41-47 Nm) torque
Source: manual:04584355ed3c.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.