Home›Repair guides›Ingersoll Rand›Operational Test

Ingersoll Rand — Operational Test

Operation · Winch

From a Ingersoll Rand service manual — check it applies to your exact model before use.

Before you start

  • Do not allow brake to overheat during lining run-in

Procedure

  1. Check oil level in motor, reduction gear assembly and disc brake are correct.
  2. To break in new or overhauled motors operate without load, in both directions, for 2 hours at 100 - 200 RPM.
  3. Run in new drum brake band linings: operate without load in the payout direction while gradually applying the brake.
  4. Allow the brake to slip for approximately one minute; do not allow brake to overheat.
  5. Check operation of brakes and adjust if necessary.
  6. Check operation of limit switches, locking devices and all safety devices when equipped.
  7. Check foundation mounting fasteners are secure.
  8. Install drum guard when provided.

Specs & values

  • 2 hours at 100 - 200 RPM no load
  • Brake slip approximately one minute

Source: Ingersoll Rand service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Ingersoll Rand repair guides →