Home Generators - Alpha Gen — Refer to the CE3X2 Telecom Series Enclosure Installation manual (p/n 031-099-C3)
For these Home Generators - Alpha Gen models: AlphaGen 3.5kW, AlphaGen 5.0kW, CE3X-2.
Browse Home Generators - Alpha Gen generators & specs →
Procedure
- 2.2.1 Ignition Battery Test Procedure
- 1. Connect a DVM (set for DC Volts) to the IGN BATT terminals. Connect the Red (+) lead of the DVM to the (+) terminal and the Black lead (-) of the DVM to the (-) terminal.
- 2. lower than specified, recharge the batteries to 13.8 VDC before proceeding. WARNING: Do not use batteries (AGM or Gell Electrolyte) that read below 9.0 VDC, as the battery may be discharged below a safe point and could cause gassing during recharge.
- 2. Turn-Up and Test 28 031-099-B4-002 Rev. C TM ©2000
- 2.2.3 Starting a Local APU Test Procedure:
- 1. Locate APU control board (mounted alongside the ECM).
- 2.2.2 Engine Lubrication Check Engine lubrication Level Procedure: Check the engine crankcase oil level. If necessary, add oil to fill it to the FULL mark. DO NOT OVERFILL. Refer to the engine manufacturers’ operator’s manual for proper fill capacities and oil types. Ensure that the same brand of oil is used for topping the oil level, as some oil manufacturer’s additives are not compatible with each other. Never attempt to measure the oil level, or add oil, when the engine is in operation. CAUTION: Do not attempt to crank or start the engine before it has been serviced with the recommended oil, or engine failure will result. NOTE: Refer to the Alpha 5 Generator OPERATOR’S manual (p/n Tp-6076) provided by the manufacturer.
- 2.2 Initial Operation, continued Generator Control Board ECM Fig. 2-1 Location of APU Control Board
- 2. Turn-Up and Test 28 031-099-B4-002 Rev. C TM ©2000
- 2.2 Initial Operation, continued
Source: manual:3.5kW 5.0kW Operation Maint. Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.