Home›Repair guides›Hercules›New Equipment Service and Initial Starting

Hercules — New Equipment Service and Initial Starting

Operation · Engine

From a Hercules service manual — check it applies to your exact model before use.

Before you start

  • Do not crank the engine more than 15 seconds at a time; allow the starting motor to cool 1 minute between cranking periods.

Procedure

  1. Visually inspect engine for loose bolts, nuts and screws.
  2. Remove all plugs, caps, covers and tape from engine openings.
  3. Check electrical system connections and component mounting.
  4. Fill cooling system with water plus rust inhibitor or antifreeze.
  5. Adjust fan belt tension; tighten alternator mounting screws.
  6. Drain preservative oil from fuel system; check fuel lines.
  7. Replace oil filter element; fill crankcase to FULL mark.
  8. Reinstall spark plugs; crank until oil pressure reads about 10 psi.

Source: Hercules service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Hercules repair guides →