Home›Repair guides›Hercules›Cylinder Head Installation

Hercules — Cylinder Head Installation

Repair & overhaul

From a Hercules service manual covering: D-1500, D-1700, D-2000, D-2300, D-3400, De3000. Check it applies to your exact model before use.

Applies to: Hercules D Series engine

Before you start

  • Cylinder head nuts must be retightened and valve clearance reset after 1 hour of service.

Procedure

  1. Install new cylinder head gasket with bead down; use gasket cement.
  2. Install water outlet cover and gasket.
  3. Install valve assemblies.
  4. Place cylinder head assembly on block.
  5. Install cylinder head nuts and washers; tighten evenly from center outward.
  6. Tighten all nuts first to 75 foot-pounds, then 125 foot-pounds, and so forth per figure.
  7. Install valve pushrods.
  8. Install rocker arm assembly.
  9. Install fuel nozzle and holder assemblies.
  10. Install air cleaner, intake manifold, exhaust manifold, and coolant temperature gauge thermocouple.
  11. Install thermostat and housing; fill cooling system.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Cylinder head nut tightening sequence: 75 foot-pounds, then 125 foot-pounds, and so forth; final values from Table 6-1.

Source: Hercules service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Hercules repair guides →