Before you start

  • Be sure the drive disk is assembled with the chamfer on the flywheel side

Procedure

  1. Use a hoist and sling to support rotor
  2. Ensure the drive disk is assembled with the chamfer on the flywheel side
  3. Apply torque values as shown in Figure 2-9
  4. Install air baffle
  5. Using a hoist and safe lifting device, carefully move the stator into position over the rotor with leads exiting in top position
  6. Apply a thin film of Molykote grease to mating surfaces of the end bearing and the end bearing hole
  7. Install end bell assembly on the stator with the generator lead opening at top position
  8. Replace the stud nuts and torque to 20 ft lbs (27 Nom)
  9. Install the battery charge regulator bracket in the upright position
  10. Using a lead hammer, tap the end bell at horizontal and vertical plane to relieve stress
  11. Retorque end bell stud nuts
  12. Route generator leads through opening in AC control box and secure saddle to generator
  13. Connect control leads and verify all connections are correct and secure
  14. Connect the field leads F1 and F2 to the terminal board
  15. Install the end bell cover
  16. Connect the load wires to their correct terminals
  17. Connect the negative (-) battery cable and test generator operation

Tools required

  • Hoist
  • Sling
  • Lead hammer

Specs & torque values

  • Torque drive disk to flywheel: 70-80 ft lbs
  • Torque end bell stud nuts: 20 ft lbs (27 Nom)
  • Torque details: 39 ft lbs (52 Nom), 23-26 inch lbs (2.6-2.9 Nom)

Source: manual:934-0501_Onan_DL3_RV_Genset_Generator__Control_Service_manual_08-1991.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.