Home›Repair guides›General Motors›Cylinder Head Installation - Left

General Motors 5.0 / 5.7 — Cylinder Head Installation - Left

Repair & overhaul

For the General Motors 5.0 / 5.7, from the General Motors service manual.

Before you start

  • Do not use any type sealer on the cylinder head gasket, unless specified

Procedure

  1. Clean cylinder gasket surfaces on engine block and cylinder head.
  2. Inspect cylinder head locator dowel pins for proper installation.
  3. Place NEW cylinder head gasket over the locator dowel pins.
  4. Install cylinder head over dowel pins and gasket.
  5. Apply sealant to cylinder head bolt threads.
  6. Install bolts; tighten first pass to 30 N-m (22 lb ft) in sequence.
  7. Final pass to 75/65/55 degrees for long/medium/short bolts.
  8. Measure spark plug gap to 1.52 mm (0.060 in) and install NEW spark plugs.

Tools required

  • J 36660-A Torque Angle Meter Amazon

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • First pass 30 N-m (22 lb ft)
  • Long bolts 75 degrees
  • Medium bolts 65 degrees
  • Short bolts 55 degrees
  • Spark plug gap 1.52 mm (0.060 in)

Source: General Motors service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More General Motors repair guides →