General Motors 4.3L GM Engine — Throttle Body Removal/Installation
Repair & overhaul
For the General Motors 4.3L GM Engine, from the General Motors service manual.
Before you start
- Lightly lubricate the O-ring of the Mixer to throttle body assembly with Vaseline or petroleum jelly prior to installation.
Procedure
- Disconnect the negative battery cable.
- Remove Fuel Mixer (refer to Fuel Mixer procedure).
- Remove Throttle Body electrical connector.
- Remove four screws securing the Throttle Body to the Adapter.
- Remove Throttle Body and O-ring between Throttle Body and Adapter.
- Installation: inspect/replace O-ring, place on adapter, secure with four screws, torque to 12 N·m (106 in. lbs.).
- Install Fuel Mixer.
- Reconnect negative battery cable and start engine; verify correct operation in all throttle ranges.
Specs & values
- Throttle Body screws 12 N·m (106 in. lbs.)
Source: General Motors service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.