Procedure
- 5. Use an accurate AC voltmeter to check utility power source voltage across transfer switch terminals N1 and N2. Nominal line-to-line voltage should be 240 volts AC.
- 6. Check utility power source voltage across terminals N1 and the transfer switch neutral lug; then across terminal N2 and neutral. Nominal line-to-neutral voltage should be 120 volts AC.
- 7. When certain that utility supply voltage is compatible with transfer switch and load circuit ratings, turn OFF the utility power supply to the transfer switch.
- 8. On the generator panel, set the Auto/Off/ Manual switch to MANUAL. The engine should crank and start.
- 9. Let the engine warm up for about five minutes to allow inter- nal temperatures to stabilize. Then, set the generator’s main circuit breaker to its ON (or closed) position. Proceed with caution! Generator power volt- age is now supplied to the transfer switch. Contact with live transfer switch parts will result in dangerous and possibly fatal electri- cal shock. Post Installation Start-up and Adjustments
Source: manual:9f84685f-0bec-42e0-a4e9-5c2c50b4b67b.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.