Home›Repair guides›Generac›Testing The Smart A/C Module

Generac — Testing The Smart A/C Module

Testing & diagnosis

From a Generac service manual covering: RTSC400A3, RTSW300A3, RTSW400A3. Check it applies to your exact model before use.

Browse Generac generators & specs →

Procedure

  1. Turn on the Utility supply to the ATS.
  2. Verify managed loads are powered and all LEDs illuminate on Smart A/C Module.
  3. Press the TEST button on the Smart A/C Module.
  4. Verify that all connected loads to be shed become disabled.
  5. After five (5) minutes verify A/C 1 is energized and Status LED A/C 1 is ON.
  6. After another 15 seconds, verify A/C 2 is energized and Status LED A/C 2 is ON.
  7. After another 15 seconds, verify Load A/C 3 is energized and Status LED Load A/C 3 is ON.
  8. After another 15 seconds, verify A/C 4 is energized and Status LED A/C 4 is ON.

Specs & values

  • Recovery: A/C 1 at five (5) minutes
  • Recovery: A/C 2 after 15 seconds
  • Recovery: A/C 3 after 15 seconds
  • Recovery: A/C 4 after 15 seconds

Source: Generac service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Generac repair guides →