Generac 20kW — Service Procedure
For the Generac 20kW.
Browse Generac generators & specs →
Procedure
- 8.
- 9.
- 10. Connect an accurate AC voltmeter and a frequency meter
- 11. Let the generator run at full rated load for 20-30 minutes.
- 12. When testing under load is complete, turn OFF electrical
- 13. Set the generator's main circuit breaker to its OFF (or OPEN)
- 14. Let the engine run at no-load for a few minutes.
- 15. Set the AUTO/OFF/MANUAL switch to OFF. The engine should
- 2.6
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
Source: manual:9f84685f-0bec-42e0-a4e9-5c2c50b4b67b.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.