Generac All Series — Testing with Switch Installed: To test the tempera-
For the Generac All Series.
Applies to: Generac All Series
Procedure
- 1. Disconnect Wire 85 from the high coolant tempera-
- 2. Set a VOM to its "Rx1" scale and zero the meter.
- 3. Connect one VOM test lead to the switch terminal
- 4. Check that no electrical loads are connected to the
- 5. if the generator starts, hold the terminal end of Wire
Source: manual:C_OPTION.PDF. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.