Procedure
- Set the generator main circuit breaker to its OFF (or OPEN) position.
- Set the generator AUTO/OFF/MANUAL switch to the OFF position.
- Turn OFF all breakers on the load center of the transfer box (T1 and T2).
- Turn OFF all loads connected to the transfer switch terminals T1 and T2.
- Check the engine crankcase and reservoir oil level and, if necessary, fill to the dipstick FULL mark with the recommended oil.
- Check the fuel supply. Gaseous fuel lines must have been properly purged and leak tested in accordance with applicable fuel-gas codes.
- All fuel shutoff valves in the fuel supply lines must be open.