Generac — CHECKING AUTOMATIC OPERATION
A Generac service procedure — check it applies to your exact model before use.
Browse Generac generators & specs →
Procedure
- Set generator’s main circuit breaker to its OFF (or OPEN) posi-
- Check that the AUTO/OFF/MANUAL switch is set to OFF.
- Turn OFF the utility power supply to the transfer switch, using
- Manually set the transfer switch to the UTILITY position, i.e.,
- Turn ON the utility power supply to the transfer switch,
- Set the generator's main circuit breaker to its ON (or CLOSED)
- Set the AUTO/OFF/MANUAL switch to AUTO. The system is
- Turn OFF the utility power supply to the transfer switch.
Tools required
- means provided
- the means provided
- the generator running
Source: manual:0H8358.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.