Generac — Service Procedure
A Generac service procedure — check it applies to your exact model before use.
Browse Generac generators & specs →
Procedure
- 2) Fit the PMG rotor in the main exciter rotor coupling
- bushing and fasten it through the internal hexagon
- headed screw M12 with torque of 120 a 140 Nm
- and anaerobic chemical lock, according to Figure
- 14.35.
- Figure 14.35: PMG rotor coupling
- Key of Figure 14.35:
- 1. Coupling bushing
- 2. PMG rotor
- 3. Internal hexagon headed screw M12
- 4. Lock washer (NORD-LOCK)
- Figure 14.36 shows PMG rotor installed.
- Figure 14.36: PMG rotor installed 132421
- Procedures of assembly and disassembly of alternators WEG – GTA and AG10 Line – North America | 37
Specs & torque values
- 140 Nm
Source: manual:WEG-assembly-and-disassembly-rocedures-g-and-ag10-line-10004126565-manual-english.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.