Generac 8kW Air-Cooled — Manual Transfer to Standby and Manual Startup
Operation · Transfer Switch
For the Generac 8kW Air-Cooled, from the Generac service manual.
Applies to: Generac V-Twin engine
Procedure
- Set generator panel auto-off-manual switch to OFF.
- Set generator main line circuit breaker to OFF or OPEN.
- Turn OFF utility power supply to transfer switch.
- Manually actuate transfer switch main contacts to STANDBY position.
- Set generator auto-off-manual switch to MANUAL. Engine should crank and start.
- Let engine warm up and stabilize for a minute or two at no-load.
- Set generator main line circuit breaker to ON or CLOSED.
Source: Generac service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.