Fischer Panda 12mini / Panda 12 mini PMS Digital — Insulation test

Testing & diagnosis · AC electrical system

For the Fischer Panda 12mini / Panda 12 mini PMS Digital, from the Fischer Panda service manual.

Applies to: Fischer Panda MINI, Fischer Panda Panda 12 mini PMS Digital, Kubota D722 engine

Before you start

  • Electrical installation only by trained and tested personnel.

Procedure

  1. Switch off all on-board electrical devices.
  2. Start generator.
  3. Measure AC voltage with voltmeter between generator housing and AC-Control box.
  4. Measure AC voltage between generator housing and ground.
  5. Voltage must not exceed 50 mV.
  6. Check safety systems and leakage current relay if installed.
  7. Check individual generated phases between each other and phase to ground.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Maximum 50 mV

Full service-parts list: Fischer Panda MINI →, Fischer Panda Panda 12 mini PMS Digital →, Kubota D722 engine →

Source: Fischer Panda service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.