HomeRepair guidesProcedure 11

MP-5667 — Procedure 11

For the MP-5667.

Procedure

  1. 3. Contactor
  2. Figure 6-10. Mechanical Latch Installation
  3. (25-80 Ampere Contactors)
  4. Coil Removal
  5. 1. Disconnect power source and load leads from
  6. contactor terminals.
  7. 2. Disconnect leads between load terminals of the
  8. two contactors.
  9. 3. Disconnect wire harness leads from auxiliary
  10. switch.
  11. 4. Loosen screws and remove contact assembly from
  12. contactor base. See Figure 6-11.
  13. 5667611
  14. Figure 6-11. Contact Assembly Removal
  15. (25-80 Ampere Contactors)

Source: manual:mp5667.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.