MP-5667 — Procedure 2
For the MP-5667.
Procedure
- 9. Reconnect the power source and load connections
- to the contactor terminals.
- 10. Shut the enclosure door.
- 11. Return the ATS to normal operation.
Source: manual:mp5667.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.