HomeRepair guidesService Procedure

GE12TIC — Service Procedure

For the GE12TIC.

Procedure

  1. Shut off manual valves on natural gas supply lines and main shutoff valve on
  2. Start engine and run until it stalls due to fuel starvation.
  3. Check to make sure gauge pressure at point on the natural gas fuel line to be
  4. Disconnect engine batteries using switch in battery compartment or by
  5. Slightly loosen the NG fuel line fitting to be serviced in a well ventilated area
  6. Completely open the fitting that was slightly opened and allow to vent in a well

Tools required

  • 3) Check to make sure gauge pressure at point on the natural gas fuel line to be
  •  Use only tools which are in satisfactory condition. Worn open-end wrench slip,

Source: manual:tp6837.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.