MP-5667 — Coil Installation
For the MP-5667.
Procedure
- 1. Install the coil in the contactor base.
- 2. Reconnect wire harness leads to coil and tighten
- screws.
- 3. Install contact assembly on contactor base and
- tighten screws.
- 4. Reconnect wire harness leads to auxiliary switch.
- 5. Reconnect leads between load terminals of the two
- contactors.
- 6. Reconnect load and power source leads to
- contactor terminals.
- Component Removal and
- Installation—145-400 Amp
- Contactors
- Mechanical Interlock Removal
Source: manual:mp5667.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.