MP-5667 — Mechanical Latch Installation
For the MP-5667.
Procedure
- 3. Contactor
- Figure 6-10. Mechanical Latch Installation
- (25-80 Ampere Contactors)
- Coil Removal
- 1. Disconnect power source and load leads from
- contactor terminals.
- 2. Disconnect leads between load terminals of the
- two contactors.
- 3. Disconnect wire harness leads from auxiliary
- switch.
- 4. Loosen screws and remove contact assembly from
- contactor base. See Figure 6-11.
- 5667611
- Figure 6-11. Contact Assembly Removal
- (25-80 Ampere Contactors)
- 5. Loosen screws and disconnect wire harness leads
- from the coil.
- 6. Remove the coil from the contactor base. See
- Figure 6-12.
- 5667612
Source: manual:mp5667.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.