Doosan — Step 16 –
A Doosan service procedure — check it applies to your exact model before use.
Browse Doosan generators & specs →
Procedure
- Step 16 –
- Remove the four bolts on top of
- the Racor canister.
- Remove the CCV hoses on the T.
- Verify the Racor filter integrity.
- If oil saturation is present,
- replacement will be necessary.
Source: manual:CCV Reroute Instructions.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.