Deutz — Dismantling engine
Repair & overhaul · Complete engine
From a Deutz service manual covering: F2L 1011, F3L 1011, F4L 1011. Check it applies to your exact model before use.
Browse Deutz generators & specs →
Before you start
- Starter to be removed before with 2- and 3-cylinder engines.
Procedure
- Clamp engine in swivel-type engine assembly stand. Drain oil / residual oil.
- Remove hood, stay plate and oil cooler.
- Remove leakage fuel pipe and cooling air ducting.
- Remove injection lines and take adapters out of thermostat housing.
- Take off clamping pads. Remove injectors.
- Remove fuel lines and fuel feed pump.
- Remove oil filter housing and fuel filter housing.
- Remove idler pulley, take off V-belt and remove blower together with alternator.
- Remove wiring harness, V-belt pulley and toothed belt guard.
- Remove toothed belt, camshaft gear and crankshaft gear.
- Remove lube oil pump, crankcase breather and lift off valve cover.
- Remove rocker arm brackets and take out pushrods.
- Remove exhaust manifold, air intake manifold and lift off cylinder head.
- Remove starter, loosen flywheel bolts, remove flywheel and adapter housing.
- Remove injection pumps, oil pan, front cover, rear cover, camshaft and pistons; remove main bearing caps and lift out crankshaft.
Tools required
- Torx tools Amazon
- Hose clip pliers Amazon
- Engine assembly stand 6067 Amazon
- Multipower tool STW392 Amazon
- Puller 143100 Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Source: Deutz service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.