Home›Repair guides›Detroit Diesel›Removal of the DD13 Cylinder Head

Detroit Diesel — Removal of the DD13 Cylinder Head

Repair & overhaul

From a Detroit Diesel service manual — check it applies to your exact model before use.

Before you start

  • Support the heavy cylinder head properly with a lifting device.

Procedure

  1. Steam clean the engine; disconnect the batteries.
  2. Drain fuel, oil, and coolant; remove turbocharger inlet pipe.
  3. Remove the rocker cover.
  4. Disconnect electrical harness connections (coolant outlet temp, delta-p, intake manifold air temp, throttle valve, intake air temp).
  5. Remove high pressure fuel injector lines and high pressure fuel lines from rail to pump.
  6. Remove amplifier return line, needle return line and PLV lines.
  7. Disconnect fuel injector harness from injectors and engine brake solenoids.
  8. Remove the rocker arm shafts and the intake and exhaust camshafts.
  9. Remove the camshaft housing.
  10. Remove the EGR crossover tube and the two bolts attaching cold boost pipe to support bracket.
  11. Using Flywheel and Main Pulley Socket tool (J-45390), remove the 40 bolts securing the cylinder head.
  12. Using Cylinder Head/Engine Lifting Bar tool (W470589006200), remove the cylinder head.
  13. Remove and discard the metallic gasket from the cylinder block.

Tools required

  • J-45390 Flywheel and Main Pulley Socket Amazon
  • W470589006200 Cylinder Head/Engine Lifting Bar Amazon

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Source: Detroit Diesel service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Detroit Diesel repair guides →