Home›Repair guides›Detroit Diesel›Install Power Take-Off

Detroit Diesel — Install Power Take-Off

Installation · Hydraulic power take-off (PTA-0101-H)

From a Detroit Diesel service manual — check it applies to your exact model before use.

Before you start

  • Use SAE 30W oil for temperatures above 32°F (0°C) or SAE 10W oil for temperatures below 32°F (0°C)

Procedure

  1. Support the assembly with a chain hoist and sling and position square against the engine flywheel housing.
  2. Enter the pilot of the clutch housing straight into the flywheel housing.
  3. Secure with sixteen 1/2"-13 x 1 1/2" bolts and lock washers; tighten to 71-75 lb-ft (96-102 N*m).
  4. With access cover removed, rotate clutch driven discs and assemble six 5/8"-11 x 1 1/2" clutch drive bolts into flywheel; tighten to 81-97 lb-ft (110-132 N*m).
  5. Secure the access hole cover with four bolts.
  6. Align and install the support bracket bolts in the power take-off housing; tighten to proper torque.
  7. Remove the chain hoist sling and lifting eye.
  8. Add lubricating oil through the breather filter hole tube until oil level reaches the check plug hole (SAE 30W above 32°F/0°C or SAE 10W below).
  9. Reinstall the breather filter and check the hole plug before starting the engine.
  10. Before applying load and with the clutch released, rotate the shaft by hand to check for free turning.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • 71-75 lb-ft (96-102 N*m) mounting bolts
  • 81-97 lb-ft (110-132 N*m) clutch drive bolts

Source: Detroit Diesel service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Detroit Diesel repair guides →