Home›Repair guides›Detroit Diesel›Fuel Injector Nozzle Installation

Detroit Diesel — Fuel Injector Nozzle Installation

Installation

From a Detroit Diesel service manual — check it applies to your exact model before use.

Before you start

  • Do not tighten the thrust bolt until the tensioning arm has been fully tightened to the correct torque value.

Procedure

  1. Measure the length of the tensioning arm M10 retaining bolt with a dial caliper (new 90.0 mm, max 91.0 mm).
  2. Lubricate a new nozzle O-ring with engine oil and install it on the nozzle.
  3. Using heat isolator installer J-46384, press the new heat isolator onto the nozzle.
  4. Install the nozzle in the cylinder head; align the notch in the tensioning arm with the pin on top of the nozzle.
  5. Install the retaining bolt in the tensioning arm; tighten to 50 N·m (37 lb·ft).
  6. Lubricate a new transfer-tube O-ring with engine oil and install it on the transfer tube.
  7. Install the transfer tube in the cylinder head; tighten the thrust bolt to 45 N·m (33 lb·ft).
  8. Install the injector line (refer to 2.3.2).
  9. Install the charge-air manifold (refer to 6.1.2).
  10. Install the cylinder head cover(s) as removed (refer to 1.1.2).
  11. Install the engine trim covers.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Tensioning arm retaining bolt: 50 N·m (37 lb·ft)
  • Thrust bolt: 45 N·m (33 lb·ft)
  • Bolt shaft length new: 90.0 mm (3.54 in.)
  • Bolt shaft length maximum: 91.0 mm (3.58 in.)

Source: Detroit Diesel service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Detroit Diesel repair guides →