Home›Repair guides›Detroit Diesel›Flushing Cooling System

Detroit Diesel — Flushing Cooling System

Maintenance

From a Detroit Diesel operator's manual — check it applies to your exact model before use.

Before you start

  • Fill slowly to prevent rapid cooling and distortion of engine castings.

Procedure

  1. Drain previous season's solution from engine.
  2. Refill with soft, clean water; fill slowly if engine hot.
  3. Start engine and operate 15 minutes to circulate water.
  4. Drain cooling system completely.
  5. Refill with solution required for coming season.

Source: Detroit Diesel operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Detroit Diesel repair guides →