Detroit Diesel — Assembly
Repair & overhaul · Aftertreatment Device (ATD)
From a Detroit Diesel service manual — check it applies to your exact model before use.
Procedure
- On a work surface, position the three sections of the ATD.
- Wipe down outlet section with suitable cleaning fluid.
- Install new graphite gaskets.
- Join the three sections and slide the V-band clamps in position.
- Tighten the V-band clamps; torque to 16-18 Nm (12-13 lb ft).
Tools required
- Torque wrench Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- V-band clamps: 16-18 Amazon eBay FridayParts $49.39 Nm (12-13 lb ft)
Source: Detroit Diesel service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.