Home›Repair guides›Cummins/Onan›Preparation for Operation

Cummins/Onan WC4-10S-5 — Preparation for Operation

Installation · Power unit

For the Cummins/Onan WC4-10S-5, from the Cummins/Onan service manual.

Browse Cummins/Onan generators & specs →

Before you start

  • Do not service the power unit with gasoline while it is in operation or while a radio transmitter is operating nearby.

Procedure

  1. Recheck all installation instructions have been complied with.
  2. Crank the engine over a few times with the hand crank to make sure pistons and generator move freely.
  3. Be sure the battery or batteries are well charged.
  4. Fill the crankcase with oil to the FULL level; use S.A.E. number per lowest temperature expected.
  5. Remove air cleaner winged nut, lift filter element, fill oil cup to level with same oil as crankcase (not diluted).
  6. Place a drop of oil in each ball joint of the governor-to-throttle and governor-to-Modutrol control rods.
  7. Close the drain cock at the bottom of the radiator and the drain cock on the cylinder block.
  8. Fill radiator to about 1 inch below filler neck with clean, alkali-free water; add anti-freeze if freezing.
  9. Fill the fuel tank with clean fresh gasoline and make sure the vent is open.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Crankcase oil capacity 4 quarts
  • Cooling system capacity about 13 quarts

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →