Cummins/Onan — VT-50/ST-50 Assembly

Repair & overhaul · Rotor assembly

From a Cummins/Onan service manual covering: ST-50, T-18A, VT-50. Check it applies to your exact model before use.

Browse Cummins/Onan generators & specs →

Before you start

  • Do not over torque the nut; this will deform the shaft
  • Do not exceed recommended V-band clamp torque

Procedure

  1. Check turbocharger bearing end clearance on shaft; should be 0.006 to 0.010 inch [0.15 to 0.25 mm].
  2. Install insulation pad and heat shield on bearing housing.
  3. Position sealing rings in grooves on turbine end of rotor shaft and insert shaft in housing.
  4. Insert bearing over shaft into bore and position bearing insert over bearing flange.
  5. Install new O-ring and oil seal sleeve assembly into diffuser plate.
  6. Install diffuser plate; press compressor wheel on shaft; install new locknut torqued to 20 to 24 ft-lb [27 to 33 N-m].
  7. Install collector housing and torque capscrews to 5 to 7 ft-lb [7 to 9 N-m].
  8. Insert rotor assembly in turbine housing and install V-band clamps torqued to 32 to 36 in-lb [3.6 to 4.1 N-m].

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Rotor nut 20 to 24 ft-lb [27 to 33 N-m]
  • Collector housing capscrews 5 to 7 ft-lb [7 to 9 N-m]
  • V-band clamps 32 to 36 in-lb [3.6 to 4.1 N-m]

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.