Cummins/Onan — Untitled Procedure
For these Cummins/Onan models: RSS100, RSS200.
Applies to: Cummins Onan Rss100, Cummins Onan Rss200
Procedure
- Verify that the Exercise LED is off.
- To set and exercise period that will start 12 hours from now and repeat every 28 days
- Operation
- To start an immediate exercise period and have it repeat, press and hold the Set
- Record the exercise start time for future reference.
- While the transfer switch is connected to the utility, utility power fails. The Utility Connected
- The time delay engine start (TDES) begins.
- When the TDES expires, the internal start contact closes P5-6 and P5-7, sending a start
- Operation
- When the generator set starts and produces power, the Generator Power Available LED
- A Time Delay Normal-to-Emergency (TDNE) begins.
- After the TDNE timer expires, the Open Normal (P5-1) and Close Emergency (P5-4) output
- Limit switch ASW removes the ground signal from P4-7, signaling that the transfer switch
- The load is transferred to the generator.
- The utility returns. The Utility Power Available LED lights.
- A time delay emergency to normal (TDEN) begins.
- After the TDEN timer expires, the Open Emergency (P5-3) and Close Normal (P5-2) output
- Limit switch BSW removes the ground signal from P4-8, signaling the ATS has
- The control starts the Time Delay Engine Cooldown (TDEC) timer.
- When the TDEC timer expires, the P5-6 to P5-7 contact opens, the generator set stops
- The load is retransferred to the utility.
- Operation
- While the transfer switch is connected to the utility, the utility power fails. After a three
- After the generator warms up (five second TDNE), the generator control signals the relay
Source: manual:Onan-RSS_ATS_OwnerManual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.