Cummins/Onan — 5. Preparing for Service
For these Cummins/Onan models: HGJAA (Spec A-E), HGJAB (Spec A-E), HGJAC (Spec A-C), HGJAD (Spec A-E), HGJAE (Spec A-E), HGJAF (Spec A-C).
Browse Cummins/Onan generators & specs →
Procedure
- Preparing for Service
- Control
- Enables cranking.
- Energizes the fuel pump E2 (gasoline models only).
- Control
- Depending on model:
- Flashes the field (F1-F2).
- Flashes the status indicator light during cranking.
- Disconnects the starter when engine speed is greater than 1300 rpm and turns the status indicator
- Turns on Switched B+ (remote pin J8-F).
- Enables output voltage two seconds after operating speed is reached.
- Turns off field flash.
- Disables output voltage.
- De-energizes the fuel pump and fuel cutoff solenoid or fuel injectors.
- Enables ignition kill.
- Turns off the status indicator light.
- Writes session data (number of cranks, minutes of operation, last fault, etc.) to non-volatile memory
- Removes processor power when idle 5 minutes (15 minutes, HGJAA and HGJAD).
Source: manual:HGJAA, HGJAB, HGJAC, HGJAD, HGJAE, HGJAF Service Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.