Home›Repair guides›Cummins/Onan›Transfer Switch Test

Cummins/Onan — Transfer Switch Test

Testing & diagnosis · Transfer switch, control, and generator

From a Cummins/Onan service manual — check it applies to your exact model before use.

Browse Cummins/Onan generators & specs →

Before you start

  • Use care when opening cabinet door. High voltages within cabinet and rear side of cabinet door present a serious electrical shock hazard.

Procedure

  1. If optional exerciser is included, open cabinet and move the With Load/Without Load selector switch to the WITH LOAD position.
  2. Verify that the bypass switch handle is in the AUTOMATIC position.
  3. Move the Test/Normal/Retransfer switch to the TEST position; generator set should start and load should transfer after preset time delays.
  4. Check operation of the AC meters on the cabinet (if equipped).
  5. Move the Test/Normal/Retransfer switch to the NORMAL position; load should retransfer and generator set should stop after preset time delays.

Specs & values

  • Red Emergency Source and Transfer-Switch-Position lamps should be ON after transfer
  • Green Normal Source and Transfer-Switch-Position lamps should be ON after retransfer

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →