Home›Repair guides›Cummins/Onan›Time the injection pump by depth micrometer

Cummins/Onan — Time the injection pump by depth micrometer

Adjustments

From a Cummins/Onan service manual covering: 205D3A, 3DJA, 3DJA-1E2236, 3DJA-3E2236. Check it applies to your exact model before use.

Applies to: Cummins/Onan DJA engine

Before you start

  • Injection pump must be timed on the compression stroke, not exhaust stroke.

Procedure

  1. Install pump tappet in its recess.
  2. Position flywheel on port closing mark (PC) of compression stroke.
  3. Measure distance from pump mounting pad to tappet center with depth micrometer.
  4. Subtract measured depth from 1.670 in. port closing dimension.
  5. Result is thickness of shims necessary.
  6. Select correct shims and install pump.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • 1.670 in. port closing dimension
  • Shims .006 in. to .052 in.

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →