Home›Repair guides›Cummins/Onan›Testing Winding Insulation Resistance

Cummins/Onan — Testing Winding Insulation Resistance

Testing & diagnosis · Generator windings

From a Cummins/Onan service manual — check it applies to your exact model before use.

Browse Cummins/Onan generators & specs →

Before you start

  • Disconnect starting battery cables (negative first) before performing tests.

Procedure

  1. Apply the test potential between the winding and ground (winding laminations) for 10 minutes.
  2. Record resistance at 1 minute and again at 10 minutes.
  3. For a new generator with dry windings, obtain at least 5 megohms.
  4. Polarization index should be at least 2.
  5. For a set in service, resistance should not be less than 1 megohm.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • At least 5 megohms new; not less than 1 megohm in service; polarization index at least 2

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →