Cummins/Onan RSS100 / RSS200 — Start-Up and Test Procedure
Installation · Transfer switch
For the Cummins/Onan RSS100 / RSS200, from the Cummins/Onan service manual.
Browse Cummins/Onan generators & specs →
Before you start
- The failure to install the front panel on the transfer switch cabinet can result in severe personal injury or death.
Procedure
- Make sure the front cover is installed on the transfer switch.
- Make sure the generator set is installed and its operation selector switch is in the Remote/Auto position.
- Turn on the breaker in the utility panel that feeds the utility power connection of the transfer switch.
- Open the controller security cover; the Utility Power Available and Utility Power Connected LEDs will be lit.
- Switch the main circuit breaker from the ON to the OFF position.
- Make sure the generator control receives a start signal and the load transfers after TDNE expires.
- Switch the main circuit breaker from the OFF to the ON position.
- Make sure the load transfers back after a 10-minute TDEN and the generator stops after a 10-minute TDEC.
Specs & values
- TDEN 10 minutes
- TDEC 10 minutes
Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.