Procedure
- Switch the main circuit breaker from the ON to the OFF position.
- Press the Mode button and select Test mode by pressing the Info button.
- Verify the generator set control receives a signal to start.
- Verify the load transfers from the utility to the generator set after starting.
- Switch the main circuit breaker from OFF to ON.
- Press the Mode button and select START INHIBIT mode.
- Verify the load is immediately transferred back to the utility.
- Verify the generator set cools down and stops after the Cooling time delay expires.