Home›Repair guides›Cummins/Onan›Reconnection

Cummins/Onan — Reconnection

Adjustments · Generator bus-bars (12 lead)

From a Cummins/Onan service manual — check it applies to your exact model before use.

Applies to: Cummins/Onan DFM

Procedure

  1. Reconnect bus-bars for the different voltage per Figure 16
  2. Reconnect lead from terminal 63 (inside control box) to either H3, H4 or H5
  3. Select the proper tap on voltage reference transformer (T21) per Figure 2

Specs & values

  • Terminal 63 to H3, H4 or H5
  • Adjust voltage regulator tap on TB21 terminal in control cabinet

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →