Home›Repair guides›Cummins/Onan›Preparing Engine for Service

Cummins/Onan — Preparing Engine for Service

Repair & overhaul · Engine/generator assembly

From a Cummins/Onan service manual — check it applies to your exact model before use.

Applies to: Cummins/Onan Performer P224 engine

Procedure

  1. Remove the rear panel of the housing.
  2. Remove B+ battery cable from starter and B- battery cable from engine.
  3. Disconnect plugs P2 and P4 of the control harness.
  4. Disconnect the five leads of the governor controller board.
  5. Disconnect the B+ lead from the voltage regulator.
  6. Disconnect the flexible fuel supply line from the carburetor (NG/LP vapor) or LPG converter (LP liquid).
  7. Remove the generator bond strap from the skid base.
  8. Remove the two engine vibration isolator center-bolts.
  9. Remove the four screws that secure the alternator support bracket to the skid base.
  10. Slowly turn the engine/generator counter-clockwise, avoiding tension on the alternator harness wires.
  11. Reassembly is the reverse. Torque isolator center-bolts to 30-35 lb-ft and bracket screws to 25-35 lb-ft.

Specs & values

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →