Home›Repair guides›Cummins/Onan›Piston/Rod Assembly Installation

Cummins/Onan — Piston/Rod Assembly Installation

Repair & overhaul · piston/connecting rod

From a Cummins/Onan service manual covering: 4.5 MCE, 5.0 MCE, 6.5 MCE. Check it applies to your exact model before use.

Applies to: Cummins/Onan 4.5 MCE, Cummins/Onan 5.0 MCE, Cummins/Onan 6.5 MCE, Cummins/Onan MCE engine

Procedure

  1. Turn crankshaft until crankpins are at bottom of stroke.
  2. Lubricate pistons and cylinders and compress rings with a ring compressor.
  3. Position piston/rod assemblies with connecting rod cap bolt offsets outward.
  4. Tap pistons down with wood hammer handle until rods seat on crank pins.
  5. Use Plasti-gage (green code) to check crankpin bearing clearance.
  6. Lubricate crankpin, attach cap, torque cap bolts to specification.
  7. Confirm rod moves freely side-to-side; loosen and retap cap if not.
  8. Crank engine by hand to check all bearings are free.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Full service-parts list: Cummins/Onan 4.5 MCE →, Cummins/Onan 5.0 MCE →, Cummins/Onan 6.5 MCE →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →