Home›Repair guides›Cummins/Onan›Parallel operation wiring

Cummins/Onan — Parallel operation wiring

Installation · Parallel Instapac units

From a Cummins/Onan owner's manual — check it applies to your exact model before use.

Browse Cummins/Onan generators & specs →

Before you start

  • Don't attempt to use standard Instapacs for parallel operation without special modification instructions from the factory.

Procedure

  1. Connect 4 wire harness included with 'B' unit to TB2 in each unit. The harness is numbered with metal tabs for proper wiring.
  2. Install line and load wires to 'A' unit.
  3. Install N and AC wires from 'A' unit to 'B' units. See wiring diagram for 'A' and 'B' units packed with shipment.
  4. Check normal operation by applying AC power to regular load.
  5. Install input jumper leads included with 'B' units to connect all + and - leads in parallel.
  6. Connect the battery leads. Connect battery positive (+) lead to red (+) terminal of unit 'A'. Connect battery negative (-) lead to black (-) terminal of unit 'B' which is last in the series of Instapa

Source: Cummins/Onan owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →