Home›Repair guides›Cummins/Onan›Wall Mount Installation

Cummins/Onan OT UCD 280 — Wall Mount Installation

Installation · Transfer switch cabinet

For the Cummins/Onan OT UCD 280, from the Cummins/Onan service manual.

Browse Cummins/Onan generators & specs →

Before you start

  • Be sure to have sufficient manpower for lifting cabinet to prevent serious personal injury.

Procedure

  1. Install two top mounting bolts in the wall for the top cabinet mounting keyholes.
  2. With the shipping box standing so the cabinet is upright, carefully remove the top and sides of the box.
  3. Raise cabinet and mount on the two mounting bolts in the wall using cabinet keyholes.
  4. Open cabinet, remove twist-lock, disconnect plug and open control panel.
  5. Remove screws from meter-lamp panel flange and open panel.
  6. Tighten two top mounting bolts.
  7. Install two bottom mounting bolts and tighten.

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →