Home›Repair guides›Cummins/Onan›Mounting the Cabinet

Cummins/Onan — Mounting the Cabinet

Installation · Transfer switch cabinet

From a Cummins/Onan service manual — check it applies to your exact model before use.

Browse Cummins/Onan generators & specs →

Before you start

  • Transfer switch cabinet is heavy and can cause serious injury if dropped. Keep hands and feet clear while lifting cabinet.

Procedure

  1. Place the shipping box upright and carefully open and remove the shipping box.
  2. Check the unit for completeness and general condition.
  3. Use 3/8 inch mounting studs to anchor the cabinet to the floor; refer to the outline drawing for spacing.
  4. Use six mounting studs to secure the 400 Amp model; use eight for the 800 and 1000 Amp models.
  5. Hoist the cabinet into position using appropriate lifting equipment; the two eyebolts at the top may be used.
  6. Place a flat washer and nut on each stud and tighten securely; the floor must be flat or the cabinet may be distorted.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • 3/8 inch mounting studs
  • 6 mounting studs for 400 Amp; 8 mounting studs for 800 and 1000 Amp
  • Two steel rails attached to the bottom of the cabinet for mounting

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →