Home›Repair guides›Cummins/Onan›Break-in Procedure

Cummins/Onan M-1600-2 — Break-in Procedure

Maintenance · engine

For the Cummins/Onan M-1600-2, from the Cummins/Onan operator's manual.

Browse Cummins/Onan generators & specs →

Procedure

  1. After starting, plug in appliances totaling one-half capacity (about 2,000 watts)
  2. Run generator set with this load for two hours
  3. Operate at three-quarters capacity for another two hours
  4. Change engine crankcase oil after first 50 hours, then every 150 hours

Source: Cummins/Onan operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →