Cummins/Onan — Location

Installation · Genset

From a Cummins/Onan service manual — check it applies to your exact model before use.

Browse Cummins/Onan generators & specs →

Procedure

  1. For average standby installation, a warm indoor site is usually required.
  2. Location should be dry, well ventilated, and reasonably dust free.
  3. Normally locate near main power line switch.
  4. Provide at least 24 inches clearance on all sides for servicing.

Specs & values

  • 24 inches

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →