Cummins/Onan — Line, load, and battery connection

Installation · AC line, load, and battery terminals

From a Cummins/Onan owner's manual — check it applies to your exact model before use.

Browse Cummins/Onan generators & specs →

Before you start

  • Proper polarity of battery and ac line-load connections must be observed or transistor inverter will be instantly destroyed.
  • Reverse polarity of battery will burn out transistors.

Procedure

  1. Connect ac lines and load to proper terminals on TB1. The 10-32 screw terminals will accept lugs up to 7/16 inch wide. BE CERTAIN they are correctly installed.
  2. Check normal operation by applying line ac power to regular load.
  3. Connect batteries MAKING CERTAIN the positive lead (+) is connected to the red (+) terminal and the negative lead (-) is connected to the black (-) terminal. The 1/4-20 terminal studs will accept lugs

Source: Cummins/Onan owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.