Cummins/Onan — INSPECTION OF PARTS
For these Cummins/Onan models: NH-MS/1, NH-S/1.
Browse Cummins/Onan generators & specs →
Procedure
- Testing Field Coils For Grounds. Referring to Figure 42, place one lead on the connector and the other on a clean spot on the frame after unsol- dering shunt field coil wire. If the ohmmeter reading is low, the fields are grounded, either at the connector or in the windings.
- Testing Field Coils For Open Circuit. Place one lead on the connector and the other on a clean spot on the brush holder per Figure 43. If the
Source: manual:940-0402 Onan NH (spec A-D) Industrial Engine Operators & Parts manual (01-1973).pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.