HomeRepair guidesINSPECTION OF PARTS

Cummins/Onan — INSPECTION OF PARTS

For these Cummins/Onan models: NH-MS/1, NH-S/1.

Browse Cummins/Onan generators & specs →

Procedure

  1. Testing Field Coils For Grounds. Referring to Figure 42, place one lead on the connector and the other on a clean spot on the frame after unsol- dering shunt field coil wire. If the ohmmeter reading is low, the fields are grounded, either at the connector or in the windings.
  2. Testing Field Coils For Open Circuit. Place one lead on the connector and the other on a clean spot on the brush holder per Figure 43. If the

Source: manual:940-0402 Onan NH (spec A-D) Industrial Engine Operators & Parts manual (01-1973).pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.